The method · one lot, all the way

A lot becomes a building in seven steps.

This is how we take a single San Jose parcel from "which one" to a pitch deck - selection, verification, envelope, yield, pro forma, drawings, package. Every figure below is from the real run on 2165 The Alameda, including the one that says the deal does not work.

Run 2026-09-15 · page rebuilt 2026-09-16

01

Site selection

Pick the lot

Every main-street parcel in the study area is ranked by latent capacity - what the rules permit minus what is standing on it now. Anything carrying a live development application is excluded, because the point is to show what could happen, not to redraw somebody's file.

Goes in

County parcel fabric, General Plan designation, building footprints, the city's live application register

Comes out

A ranked shortlist, each with its own capacity gap

San Jose

2165 The Alameda, APN 23018033 - 2,164 m², 30 m of frontage, 74% built today, no file against it

02

Verification

Check it is real

The published vacant-land inventory cannot be trusted on its own. Every candidate is re-resolved point-in-parcel against the live county layer and then looked at on orthoimagery before it is used. This step is the whole difference between a lead magnet and an embarrassment.

Goes in

The shortlist, the live county fabric, current aerial imagery

Comes out

A verified boundary, or the candidate is dropped

San Jose

The city's inventory named APN 28211036, which no longer exists in the county fabric; three of its Bascom Ave "vacant" lots are visibly built on. 94 of 96 candidates re-resolved.

03

What the rules allow

Find the envelope

Setbacks applied by what each edge actually faces, the stepback where it triggers, the rear plane where there is one, height and floor area ratio together. Then the question that decides the deal: which line binds first.

Goes in

Zoning and General Plan standards, the verified polygon

Comes out

A buildable envelope, and the binding constraint named

San Jose

3 storeys, 4,203 m² gross. Floor area ratio binds at 2.0 with the height allowance unused - 23 m permitted, 10.40 m built.

04

Yield

Fill it with homes

Plates are subdivided into a real unit mix, not a density assumption. Upper floors are cut to a 20 m habitable bar, because a double-loaded corridor deeper than that leaves rooms without a window - daylight sets plate depth, not zoning.

Goes in

The envelope, a unit-size schedule, circulation and core

Comes out

Unit count and mix, retail area, the measured plate

San Jose

35 homes over 426 m² of shops. 9 studios, 18 one-beds, 8 two-beds. The daylight rule took the plate from 1,598 to 1,303 m².

05

Pro forma

Price it honestly

Rents, costs, fees and cap rate, every single input carrying the source string it came from. A number with no source does not enter the model, and the count of verified versus assumed inputs is printed on the output so the reader can weigh it.

Goes in

Market rents, cost benchmarks, fees, exit assumptions - each sourced

Comes out

Yield on cost against cap rate, profit, and the sensitivity that moves it

San Jose

4.34% yield on cost against a 4.65% cap - minus 31 basis points. It does not clear. At a floor area ratio of 2.54 it breaks even. 5 inputs verified, 4 modelled, 22 assumed.

06

Plans, section, massing

Draw it

Site plan, ground floor, typical floor, section and massing, generated from the same polygons the pro forma counted. The drawing and the number come from one geometry, so they cannot disagree - which is the failure mode of every feasibility deck assembled by hand.

Goes in

The measured envelope and the unit schedule

Comes out

A drawing set and a massing model, dimensionally tied to the numbers

San Jose

Two modelling errors were caught this way and are on the record: a 28 m-deep slab with windowless back rooms, and upper floors that flared wider than the ones below them on a trapezoidal lot.

07

Deck and campaign

Make the package

The site chapter, the envelope, the yield, the pro forma and the drawings become one document - and then the sequence that delivers it, one step per email, to the people who own land on that street.

Goes in

Everything above, plus the aerial and the site photograph

Comes out

A pitch deck, and the seven-step sequence it arrives through

San Jose

The deck is blue on white, the same brand as this page. A study that arrives in a different livery from the site it links to reads as two companies.

The part most studies leave out

The San Jose lot fails, and we published it anyway.

Minus 31 basis points. The building stops at three storeys because it exhausts a 2.0 floor area ratio with its height allowance unused - a policy number, not a market one. That is a concrete, checkable statement about why so much of this city's pipeline is entitled and not building, and it is worth more to a developer here than a study that said yes.

What this does not establish. Ownership, title, survey and availability have not been checked on this parcel - it is a selection, not an offer. The zoning district's own standards could not be read (the city's GIS server is unreachable from our machines), so the model runs on the General Plan designation, and The Alameda Urban Village Plan's guidance is unread. Both are stated on the study itself.

Two things you can have, both free.

We read San Jose's register every fortnight and we build on one of its lots in public. You can follow either, or both.

Every second Monday

The San Jose read

One page on what the register actually did this fortnight.

  • What was filed, and by whom
  • What moved a stage - and what quietly stopped
  • Which permits expired, with the owner name on each
  • What is newly ready to build

Free · unsubscribe in one click

One step at a time

The build

One real San Jose lot taken the whole way, with the arithmetic shown at every step.

  • How the lot was chosen, and how it was checked
  • The envelope, and the line that binds it
  • The homes, the rents, the costs, the spread
  • Drawings, massing and the deck it becomes

Free · seven steps · then it stops